Tuesday, September 8, 2015

Project Dustbowl: Complete

Today I was able to wrap up the final small spots of finish sanding on my 24 acres of drywall.  After that massive feat was accomplished, I also managed to shop vac all the walls and sweep the bulk of the drywall dust off the floors.  This should allow me to continue next week with the application of a primer coat on the whole project.

Below is a panoramic photo from just a few minutes ago of the layout room.  There is a wall down the center of the room that divides it into two halves, the end of which appears as a vertical strip in the photo.  A peninsula will wrap around this wall.  To the far left in the photo is a doorway which is the primary entry to the layout.  On the other side of that door will be a workroom that will also house a staging yard.  Another door is visible on the left half of the photo which will open away from the layout room into an unfinished area, serving only as a secondary entrance, which the layout will cross over.  To my back in the photo is a plain old 15' wall which will host the opening scene of the layout.  At this point I plan for the layout to dead end at that far left door, though I have been entertaining the idea of a helix down to an abbreviated second deck... Not because it's necessary, but because I'm indecisive and a little bit greedy.

-Ryan


2 comments:

  1. That looks like a great space Ryan, and a nice blank canvas to begin too. Jas...

    ReplyDelete